Triplex CeramicPlunger PumpOperating Instructions/Repair and ServiceManualFor Models:CP218CP220CP230SeriesCP200Contents:Installation Instructions: pag
10Reassembly sequence of the CP200 pumps1) If oil seals (19) were removed, replace with seal lip towards crankcase. Lubricate seals before replacin
11Preventative Maintenance Check-List & Recommended Spare Parts ListCheck Daily Weekly 50hrs Every Every Every500 hrs 1500 hr
GIANT INDUSTRIES LIMITED WARRANTYGiant Industries, Inc. pumps and accessories are warranted by the manufacturer to be free fromdefects in workmanship
2INSTALLATION INSTRUCTIONS4. Use of a dampener is necessary to minimizepulsation at drive elements, plumbing, connec-tions, and other system areas.
CP218 HORSEPOWER REQUIREMENTSRPM GPM 500 PSI 1000 PSI 1500 PSI 2030 PSI200 0.4 0.1 0.3 0.4 0.6300 0.6 0.2 0.4 0.6 0.8400 0.7 0.2 0.5 0.7 1.0500 0.9 0.
NOTE:In order to drive the pump from the side opposite the present shaft extension,simply remove the valve casing from the crankcase and rotate the pu
NOTE:In order to drive the pump from the side opposite the present shaft extension,simply remove the valve casing from the crankcase and rotate the pu
6Exploded ViewCP200 Series
ITEM PART NO. DESCRIPTION QTY.16C 08456 Tension Screw 316D 07676 Copper Gasket 316D 07204-0100 Copper Gasket (CP230 only) 316E 06823 Plu nger Extensi
8Repair KitsCP200 SeriesPlunger Packing KitPart # 09554Item # Part # Description Qty.23 08087 V-Sleeve, weep 323A 08087-0020 V-Sleeve, brown 324 07904
9NOTE: Always take time to lubricate all metal and nonmetal parts with a light film of oil before reassembly.This step will ensure proper fit, at the
Comments to this Manuals